Auction results
Auction:              Mesecna (01-31) Mart 2020 MK-BG
Auction type: Monthly
For period: 01.03.2020
31.03.2020
Held on: 07.02.2020

Border: BGMK1
Period: 1.03.2020 - 31.03.2020
Ref №: Mesecna (01-31) Mart 2020 MK-BG
Available Transmission Capacity (MW) 200,00
Auction Price: 0,60 €/MW×h
Participant's Name EIC Cap. Transmission Right acquired (MW)
1 У ПОВЕР ДООЕЛ Скопје 33XU-POWER--MKDK 3
2 СОЛАРПРО ХОЛДИНГ АД СОФИЈА Р.БУГАРИЈА- подружница во Република Македонија 33XSOLARPROHOLD6 6
3 ЕНЕРЏИ ДЕЛИВЕРИ СОЛУШНС ЕДС АД Скопје 33XEDSMACEDONIA3 35
4 ELEKTRIČNI FINANČNI TIM DOO 28XEFT-SI000000L 6
5 ГЕН-И ПРОДАЖБА НА ЕНЕРГИЈА ДООЕЛ Скопје 33XGEN-I-ENERGYT 16
6 Holding Slovenske elektrane d.o.o. 11XHSE-SLOVENIAG 83
7 ХСЕ МАК ЕНЕРЏИ ДООЕЛ Скопје 33XHSE-M-ENERGYM 3
8 ДАНСКЕ КОМОДИТИС ДООЕЛ Скопје 33XDANSKECOM--PM 20
9 ЕНСКО ТРЕЈДИНГ ДООЕЛ Скопје 33XENSCODOOELMKZ 8
10 ЕНЕРЏИ СУПЛАЈ-М ДООЕЛ Скопје 33XENERGYSUPPLY5 5
11 ЕВН ТРЕЈДИНГ ДООЕЛ Скопје 33XEVNTRADINGMKK 5
12 АКСПО МК ДООЕЛ Скопје 33XEGL-SKOPJE-15 10
TOTAL PROMISE OF CAPACITY: 200
Num. of Reg. Participants in Auction Num. of Reg. Participants in Auction who obtained the Promise of Capacity Num. of Bids placed in Auction Total Requested Capacity (MW) Congestion
16 12 68 617 Yes


Border: MKBG1
Period: 1.03.2020 - 31.03.2020
Ref №: Mesecna (01-31) Mart 2020 MK-BG
Available Transmission Capacity (MW) 150,00
Auction Price: 0,30 €/MW×h
Participant's Name EIC Cap. Transmission Right acquired (MW)
1 ИНТЕРЕНЕРГО МАКЕДОНИЈА ДООЕЛ Скопје 33X-INTERENERGOU 113
2 ГЕН-И ПРОДАЖБА НА ЕНЕРГИЈА ДООЕЛ Скопје 33XGEN-I-ENERGYT 16
3 ЕНЕРЏИ СУПЛАЈ-М ДООЕЛ Скопје 33XENERGYSUPPLY5 1
4 MVM Partner Energiakereskedelmi Zrt. 15X-MVM--------B 10
5 ЕНЕРЏИ УИНД ДОО Струмица 33XENERGYWINDMKL 5
6 ЕВН ТРЕЈДИНГ ДООЕЛ Скопје 33XEVNTRADINGMKK 5
TOTAL PROMISE OF CAPACITY: 150
Num. of Reg. Participants in Auction Num. of Reg. Participants in Auction who obtained the Promise of Capacity Num. of Bids placed in Auction Total Requested Capacity (MW) Congestion
10 6 29 275 Yes