Auction results
Auction:              Mesecna (01-30) September 2019 MK-BG
Auction type: Monthly
For period: 01.09.2019
30.09.2019
Held on: 08.08.2019

Border: MKBG1
Period: 1.09.2019 - 30.09.2019
Ref №: Mesecna (01-30) September 2019 MK-BG
Available Transmission Capacity (MW) 196,00
Auction Price: 0,00 €/MW×h
Participant's Name EIC Cap. Transmission Right acquired (MW)
1 АЛПИК ЕНЕРГИЈА СКОПЈЕ ДООЕЛ 33XATEL-SKOPJE-9 20
2 Holding Slovenske elektrane d.o.o. 11XHSE-SLOVENIAG 10
3 ДАНСКЕ КОМОДИТИС ДООЕЛ Скопје 33XDANSKECOM--PM 10
4 ЕНЕРЏИ СУПЛАЈ-М ДООЕЛ Скопје 33XENERGYSUPPLY5 5
5 ELEKTRIČNI FINANČNI TIM DOO 28XEFT-SI000000L 10
6 ЕНЕРЏИ УИНД ДОО Струмица 33XENERGYWINDMKL 10
7 ЕВН ТРЕЈДИНГ ДООЕЛ Скопје 33XEVNTRADINGMKK 5
8 ГЕН-И ПРОДАЖБА НА ЕНЕРГИЈА ДООЕЛ Скопје 33XGEN-I-ENERGYT 20
TOTAL PROMISE OF CAPACITY: 90
Num. of Reg. Participants in Auction Num. of Reg. Participants in Auction who obtained the Promise of Capacity Num. of Bids placed in Auction Total Requested Capacity (MW) Congestion
8 8 8 90 No


Border: BGMK1
Period: 1.09.2019 - 30.09.2019
Ref №: Mesecna (01-30) September 2019 MK-BG
Available Transmission Capacity (MW) 200,00
Auction Price: 0,60 €/MW×h
Participant's Name EIC Cap. Transmission Right acquired (MW)
1 ELEKTRIČNI FINANČNI TIM DOO 28XEFT-SI000000L 5
2 ДАНСКЕ КОМОДИТИС ДООЕЛ Скопје 33XDANSKECOM--PM 65
3 АЛПИК ЕНЕРГИЈА СКОПЈЕ ДООЕЛ 33XATEL-SKOPJE-9 40
4 ПЕТРОЛ-ЕНЕРГЕТИКА ДООЕЛ Скопје 33XPETROLSKOPJEM 27
5 ЕНЕРЏИ СУПЛАЈ-М ДООЕЛ Скопје 33XENERGYSUPPLY5 5
6 ГЕН-И ПРОДАЖБА НА ЕНЕРГИЈА ДООЕЛ Скопје 33XGEN-I-ENERGYT 29
7 ЕНЕРЏИ ДЕЛИВЕРИ СОЛУШНС ЕДС АД Скопје 33XEDSMACEDONIA3 5
8 ИНТЕРЕНЕРГО МАКЕДОНИЈА ДООЕЛ Скопје 33X-INTERENERGOU 24
TOTAL PROMISE OF CAPACITY: 200
Num. of Reg. Participants in Auction Num. of Reg. Participants in Auction who obtained the Promise of Capacity Num. of Bids placed in Auction Total Requested Capacity (MW) Congestion
12 8 47 373 Yes