Auction results
Auction:              Montly(1-30) June 2024 MK-BG
Auction type: Monthly
For period: 01.06.2024
30.06.2024
Held on: 13.05.2024

Border: MKBG1
Period: 1.06.2024 - 30.06.2024
Ref №: Montly(1-30) June 2024 MK-BG
Available Transmission Capacity (MW) 250,00
Auction Price: 0,30 €/MW×h
Participant's Name EIC Cap. Transmission Right acquired (MW)
1 Holding Slovenske elektrane d.o.o. 11XHSE-SLOVENIAG 30
2 ЕНСКО ТРЕЈДИНГ ДООЕЛ Скопје 33XENSCODOOELMKZ 30
3 СЕНТРАДЕ ДООЕЛ Скопје 33XSENTRADE----W 13
4 EVN Trading South East Europe EAD 32X-EVN-TSEE---K 30
5 ДУФЕРЦО МК ДОО Скопје 33XSOLARISTRADEG 50
6 ГЕН-И ПРОДАЖБА НА ЕНЕРГИЈА ДООЕЛ Скопје 33XGEN-I-ENERGYT 57
7 Axpo Bulgaria EAD 32XEGL-BULGARIAC 9
8 MVM Partner Energiakereskedelmi Zrt. 15X-MVM--------B 10
9 АКСПО МК ДООЕЛ Скопје 33XEGL-SKOPJE-15 17
10 РеНРЏИ ТРЕЈДИНГ ГРОУП ДООЕЛ Скопје 33XRENGRGYNMK03C 4
TOTAL PROMISE OF CAPACITY: 250
Num. of Reg. Participants in Auction Num. of Reg. Participants in Auction who obtained the Promise of Capacity Num. of Bids placed in Auction Total Requested Capacity (MW) Congestion
13 10 37 333 Yes


Border: BGMK1
Period: 1.06.2024 - 30.06.2024
Ref №: Montly(1-30) June 2024 MK-BG
Available Transmission Capacity (MW) 250,00
Auction Price: 0,70 €/MW×h
Participant's Name EIC Cap. Transmission Right acquired (MW)
1 РЕЊУВАБАЛ ЕНЕРЏИ СУПЛАЈ РЕС ДОО Скопје 33XSOLARPRODLSK3 85
2 ИНФИНИТ ЕНЕРЏИ ДООЕЛ Скопје 33XINFINITENERRE 7
3 LONIKO Ltd 32X001100100006C 1
4 ДУФЕРЦО МК ДОО Скопје 33XSOLARISTRADEG 25
5 EVN Trading South East Europe EAD 32X-EVN-TSEE---K 20
6 ГЕН-И ПРОДАЖБА НА ЕНЕРГИЈА ДООЕЛ Скопје 33XGEN-I-ENERGYT 30
7 СЕНТРАДЕ ДООЕЛ Скопје 33XSENTRADE----W 7
8 Ayen Energija d.o.o 23X--140706-AE-8 25
9 ПРОТЕРГИА ЕНЕРЏИ ДООЕЛ Скопје 33XPROTERGIASKPZ 25
10 Holding Slovenske elektrane d.o.o. 11XHSE-SLOVENIAG 20
11 Interenergo,energetski inženering, d.o.o. 28X-INTERENERGO8 5
TOTAL PROMISE OF CAPACITY: 250
Num. of Reg. Participants in Auction Num. of Reg. Participants in Auction who obtained the Promise of Capacity Num. of Bids placed in Auction Total Requested Capacity (MW) Congestion
18 11 68 490 Yes